Kitchen: does it need approval

Replacing cabinets, benchtops, appliances, tiles and the sink in the room the kitchen is already in, without moving a wall.

State by state

The position on an ordinary residential lot with no overlay. An overlay on your own lot can change it.

StateWhere it landsBuilding approvalSource
NSWNo approvalNot requiredCodes SEPP 2008 cl 2.51-2.52read 2026-09-15
VICNo approvalNot requiredVPP cl 62.02-2; Building Regulations 2018 (Vic) Sch 3 items 3 and 4read 2026-09-15
QLDNo approvalNot requiredBuilding Regulation 2021 (Qld) Sch 1 s 7read 2026-09-15
WANo approvalNot requiredLPS Regulations 2015 (WA) Sch 2 cl 61(1) item 5; Building Regulations 2012 (WA) Sch 4 cl 2 item 2read 2026-09-15
SANeeds checkingNot settledNo published clause
TASNo approvalNot requiredTasmanian Planning Scheme SPP cl 4.3.2; Directors Determination cl 2.0.2read 2026-09-15
ACTNo approvalNot requiredPlanning (Exempt Development) Regulation 2023 (ACT) s 1.20; Building (General) Regulation 2008 sch 1 pt 1.3 item 15read 2026-09-15
NTBuilding approval onlyRequiredNT Planning Scheme 2020 cl 1.8(1)(a); Building Act 1993 (NT) s 55read 2026-09-15

Each row is read from the instrument named against it, on the date shown. Council controls sit on top of all of them.

What the job usually involves

Strip out, new cabinetry and benchtop, splashback, sink and tapware, appliances, and the electrical and plumbing work behind them. Moving the sink or the cooktop to a different wall is still a kitchen renovation, but it is new pipework and new circuits, and it is the part that moves the price.

Check your own address

The overlays on your lot are what decide whether the row above actually applies to you.