
Knockdown rebuild · Springwood QLD
418.11 m²
Machine translationThis text was translated by machine. The original is what the person who posted it wrote.
Ask the company about the cost





More details to come
This is a custom residence on a sloping block at Springwood, construction commenced in February 2021 and completed in August 2021. The home features a swimming pool and double-level outdoor entertainment area, with a studio on the ground floor, and open-plan living space and master bedroom suite on the first floor.
This page is already public. The link goes straight out.
The blue lines come from the government licence register and are quoted as they stand. A name with no blue line has not been matched to a register record.
Sources: a builder published price is a contract price the builder chose to make public and the platform does not guarantee it. An owner reported price comes from the owner and the platform has not checked it. A declared cost is the estimate an applicant lodged with government and is not a contract price. The three are measured differently, so they cannot be compared directly.