From demolition to handover, a realistic breakdown of KDR costs across Sydney, Melbourne, Brisbane, and Perth — plus the variables that move the number most.
Bài này hiện chỉ có bản tiếng Anh. Phần khung quanh nó thì theo ngôn ngữ của bạn.
SeeBuilds Editorial
Editorial Team
The most common question from homeowners considering a KDR is: "What will it actually cost?" The honest answer is: it depends. But here's a realistic breakdown to help you budget.
Demolition costs vary by house size, materials (asbestos adds significant cost), and access. A standard 3-bedroom brick veneer house in Sydney typically costs $18,000–$25,000 to demolish including skip bins and site clean-up. Asbestos removal can add $8,000–$20,000 depending on extent.
The build cost is the largest variable. As a rough guide:
A 250m² home at mid-range would cost $625,000–$875,000 to build.
These include architect or draftsperson ($8,000–$25,000), town planner ($5,000–$15,000), structural engineer ($3,000–$8,000), and private certifier ($3,000–$6,000).
DA lodgement fees vary by council and project value. Expect $3,000–$12,000. Contributions levies (Section 7.11 in NSW) can add significantly in growth corridors.
Often underestimated. Driveway, fencing, lawn, garden, letterbox, clothesline — the list adds up quickly.
All figures are per m² of floor area and reflect 2026 market rates. Budget = project/volume builder; Mid-range = custom or semi-custom; Premium = architect-designed, high-specification finish.
| State | Demolition | Budget (per m²) | Mid-range (per m²) | Premium (per m²) |
|---|---|---|---|---|
| NSW (Sydney) | $18,000–$30,000 | $1,900–$2,400 | $2,800–$3,800 | $4,500–$7,000+ |
| VIC (Melbourne) | $15,000–$25,000 | $1,800–$2,300 | $2,600–$3,600 | $4,200–$6,500+ |
| QLD (Brisbane) | $12,000–$22,000 | $1,700–$2,200 | $2,400–$3,200 | $4,000–$6,000+ |
| WA (Perth) | $12,000–$20,000 | $1,600–$2,100 | $2,200–$3,000 | $3,800–$5,500+ |
Note: These are indicative ranges only. Final costs depend on design complexity, site conditions, materials selected, and current builder availability. Always obtain 2–3 fixed-price tenders before committing.
Three things move the number most: size of the new home, level of finish, and site conditions (slope, soil type, services). Always get a soil test done early — reactive clay or rock can add $20,000–$50,000 to your slab cost.
The only way to get a firm number is to have your design completed, then get 2–3 fixed-price tenders from builders. Never commit to a builder based on a preliminary estimate alone.