Industrial · Kaiapoi, Canterbury
Kaiapoi Oxidation Pond Sludge Removal
4 weeks
Machine translationThis text was translated by machine. The original is what the person who posted it wrote.
read as written from the company's own website; nothing the site leaves out is filled in here
More photos





The numbers on this project
- Type
- Industrial
- Build time
- 4 weeks
More details to come
What happened on this one
G&T Construction was engaged by Waimakariri District Council to remove sludge accumulation from the Kaiapoi oxidation pond. The project used a hydraulic dredging pump mounted on a 35-tonne excavator, with on-site chemical dosing to concentrate the sludge before discharge into dewatering bags.
Send this one on
This page is already public. The link goes straight out.
Same type in Canterbury
Hornby Block Three Water Supply Infrastructure Project
Ohoka Water Treatment Plant Construction Project
Sources: a builder published price is a contract price the builder chose to make public and the platform does not guarantee it. An owner reported price comes from the owner and the platform has not checked it. A declared cost is the estimate an applicant lodged with government and is not a contract price. The three are measured differently, so they cannot be compared directly. A figure marked "On the builder's website" or "Budget on the builder's website" was read as written from the company's own site and is not a contract price.