
Alterations and additions · Meadowbank, Auckland
Meadowbank Terrace Project
97 m²3 weeks
Machine translationThis text was translated by machine. The original is what the person who posted it wrote.
Ask the company about the cost
More photos





The numbers on this house
- Type
- Alterations and additions
- Floor area
- 97 m²
- Build time
- 3 weeks
More details to come
What happened on this one
97 square metre terrace built new for a residential dwelling at Meadowbank, constructed around a new swimming pool, with steps and base plate in vitex timber, construction duration approximately 3 weeks.
Send this one on
This page is already public. The link goes straight out.
Same type in Auckland
Omaha Residential Exterior Wall Renovation Project
Te Wao Project: Forest-Inspired Bathroom Laundry Extension
Riverhead Outdoor Leisure Space Renovation Project
Point Chevalier residential kitchen and living room extension and renovation
Remuera Residential New Deck and Pool Renovation
Sources: a builder published price is a contract price the builder chose to make public and the platform does not guarantee it. An owner reported price comes from the owner and the platform has not checked it. A declared cost is the estimate an applicant lodged with government and is not a contract price. The three are measured differently, so they cannot be compared directly. A figure marked "On the builder's website" or "Budget on the builder's website" was read as written from the company's own site and is not a contract price.





