Office and retail · Brandon Street, Wellington, Wellington · 2023-01 completed
Harbour City Centre Seismic Strengthening and Office Fitout
Machine translationThis text was translated by machine. The original is what the person who posted it wrote.
read as written from the company's own website; nothing the site leaves out is filled in here
More photos





The numbers on this project
- Type
- Office and retail
More details to come
What happened on this one
The Harbour City Centre project in Wellington was completed in 2023 and included selective seismic strengthening, removal of mid-level atrium stairs and floor plates with re-partitioning of tenant spaces, and installation of internal glass partitions and acoustic panels to enhance privacy and acoustic performance. The building remained in continuous operation during construction, with some works carried out at night.
What the price covers
Included
- · structural resilience
- · the functionality of the building
Not included
Not listed
Send this one on
This page is already public. The link goes straight out.
Same suburb, same type
PwC Centre Five-Storey Office Building at Wellington Waterfront
Sources: a builder published price is a contract price the builder chose to make public and the platform does not guarantee it. An owner reported price comes from the owner and the platform has not checked it. A declared cost is the estimate an applicant lodged with government and is not a contract price. The three are measured differently, so they cannot be compared directly. A figure marked "On the builder's website" or "Budget on the builder's website" was read as written from the company's own site and is not a contract price.