澳洲建房改建完整流程指南

關於澳洲房屋建造和改建,你需要知道的一切,從第一個疑問到入住新家。

項目總時長

12 到 24 個月

從第一次地塊評估到拿到入住證書。遺產區、複雜地塊和審批拖延都可能超過 24 個月,融資和臨時住處按這個預留。

下面的階段細節目前只有英文版本。外面這一層跟著你的語言走。

項目概覽

Get a Section 10.7 Certificate (NSW) / Planning Certificate

This official document from your council reveals all overlays: heritage, flood, bushfire, biodiversity, road widening. In VIC it's called a Planning Certificate. Cost: ~$100-200. Essential before anything else.

Check your LEP / Planning Scheme zone

Residential zones (R2/R3 in NSW, Neighbourhood Residential in VIC) have specific rules on density, height, setbacks, and minimum lot sizes. Find yours on the council planning map.

Measure your lot dimensions

Confirm frontage width, depth, and total area. Minimum lot size varies by council: as low as 200sqm in some inner-city zones to 600sqm+ in outer suburbs.

Check for easements and covenants

Drainage, services, and utility easements can restrict where you build. Title search reveals these. Talk to a surveyor.

Engage a Geotechnical Engineer if needed

Sloped blocks, known reactive clay soils, or flood-prone areas may need a geotech/soil classification report. This affects your slab type and foundation costs.