住宅裡的地下式或者地上式泳池、按摩池,以及必須圍起來的那圈防護籬。
一塊沒有任何疊加層的普通住宅地的位置。你自己那塊地上的疊加層可能會改變結論。
| 州 | 落在哪一檔 | 建築核准 | 來源 |
|---|---|---|---|
| NSW | 走 CDC | 要辦 | Codes SEPP 2008 cl 2.59-2.60 and Housing Code cl 3.28; Swimming Pools Act 1992 s 7, s 30B2026-09-15 讀取 |
| VIC | 只辦建築核准 | 要辦 | VPP cl 62.02-2; Building Regulations 2018 (Vic) Sch 3 item 8 and Part 9A2026-09-15 讀取 |
| QLD | 建築核准 | 要辦 | Building Regulation 2021 (Qld) Sch 1 s 13(1)(d) and Sch 2 s 1; pool safety standard, Building Act 1975 s 231D2026-09-15 讀取 |
| WA | 只辦建築核准 | 要辦 | Building Regulations 2012 (WA) reg 50, reg 50A, reg 15B, reg 53 and reg 53A; LPS Regulations 2015 (WA) Sch 2 cl 61(1) item 82026-09-15 讀取 |
| SA | 待查 | 要辦 | PDI (General) Regulations 2017 (SA) Sch 4 cl 4(1)(c) and cl 4(1)(d)(v)2026-09-15 讀取 |
| TAS | Permitted 必核 | 要辦 | Tasmanian Planning Scheme SPP cl 6.6.1; Directors Determination cl 3.1.8 and cl 1.3.112026-09-15 讀取 |
| ACT | 只辦建築核准 | 要辦 | Planning (Exempt Development) Regulation 2023 (ACT) s 1.51; Building (General) Regulation 2008 sch 1 pt 1.3 item 10; Building Act 2004 pt 5A2026-09-15 讀取 |
| NT | 無須報建 | 不用辦 | NT Building Note 114 type 8; Swimming Pool Safety Act 2004 (NT) s 6 and s 82026-09-15 讀取 |
每一列都來自那一列註明的法規,讀取日期也在那一列。議會自己的管制條款壓在這些之上。
開挖、池體、過濾、壓頂和周邊鋪面、圍籬和驗收。圍籬不是細節:它是單獨一部法,有單獨的罰則,而且跟泳池本身核准了沒有是分開執法的。
從帶價格的已發布作品裡讀出來的。這一頁沒有估價器。
暫無資料。這項工程沒有人當作品發布並標價,所以沒有可以老實讀出區間的東西。
你那塊地上的疊加層,才決定上面這一列對你到底成不成立。