
Industrial · Geraldine, Canterbury
PGG Geraldine Chemical and Bulk Product Warehouse New Build Project
Machine translationThis text was translated by machine. The original is what the person who posted it wrote.
Ask the company about the cost
More photos





The numbers on this project
- Type
- Industrial
More details to come
What happened on this one
Design and build project to demolish the existing asbestos-clad warehouse at the PGG Geraldine site and construct a new chemical and bulk product warehouse with sloped panel structure. The project includes resource consent for stormwater disposal and site contamination remediation, as well as design and construction coordination of surrounding asphalt surfacing.
Send this one on
This page is already public. The link goes straight out.
Same type in Canterbury
Hornby Block Three Water Supply Infrastructure Project
Kaiapoi Oxidation Pond Sludge Removal
Sources: a builder published price is a contract price the builder chose to make public and the platform does not guarantee it. An owner reported price comes from the owner and the platform has not checked it. A declared cost is the estimate an applicant lodged with government and is not a contract price. The three are measured differently, so they cannot be compared directly. A figure marked "On the builder's website" or "Budget on the builder's website" was read as written from the company's own site and is not a contract price.





