Skip to main content
SeeBuilds
ProjectsMy placeFind People
I am a professional
  • Projects
  • My place
  • Find People
  • Me

SeeBuilds

See what was built, what it cost, then find who built it

About →
Homeowners+
Projects →Find people →My place →Build guides →
Professionals+
I am a professional →Send a few photos →Publish a project →Directory →
Data+
Data and licences →Suburb index →Council costs →Building cost by city and region →

Language

English简体中文繁體中文Tiếng Việtالعربية한국어

Legal

Privacy Policy →Terms of Service →Unsubscribe from email →

Data is used under its publishers' open licences; see Data and licences.

© 2026 SeeBuilds

Skip to main content
SeeBuilds
ProjectsMy placeFind People
I am a professional
  • Projects
  • My place
  • Find People
  • Me

Renovation approvals

My home: does this renovation need approval

Kitchen, bathroom, deck, pergola, carport, fence, shed, garage conversion, pool. Enter your address and see which of them needs nothing, which needs a certificate and which needs the council, at this address rather than in general.

No signup. The address is used to read the heritage, flood and zoning layers over your lot.

No address yet. Pick a state to read the rules.

NSWVICQLDWASATASACTNT

Eleven jobs, and where each one lands

The NT position on an ordinary residential lot. Enter an address to apply the overlays on your own.

JobWhere it landsWhy
KitchenBuilding approval onlyNo planning approval, but the building work itself still has to be approved.

Stay inside these

This one has no measurements. It is a test of what you touch, not of how big it is.

  • A building permit is still required even though no planning approval is.
  • Electrical and plumbing work still has to be done by a licensed tradesperson and certified.
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

Required. A certifier or surveyor has to approve the building work.

Source

NT Planning Scheme 2020 cl 1.8(1)(a); Building Act 1993 (NT) s 55 · read 2026-09-15

Read the clauseMore about Kitchen
BathroomBuilding approval onlyNo planning approval, but the building work itself still has to be approved.

Stay inside these

This one has no measurements. It is a test of what you touch, not of how big it is.

  • A building permit is still required even though no planning approval is.
  • Wet area waterproofing is a building code requirement and is certified on its own, whether or not anyone had to approve the job.
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

Required. A certifier or surveyor has to approve the building work.

Source

NT Planning Scheme 2020 cl 1.8(1)(a); Building Act 1993 (NT) s 55 · read 2026-09-15

Read the clauseMore about Bathroom
Internal alterationsBuilding approval onlyNo planning approval, but the building work itself still has to be approved.

Stay inside these

This one has no measurements. It is a test of what you touch, not of how big it is.

  • A building permit is still required even though no planning approval is.
  • No approval does not mean no rules. The work still has to meet the building code.
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

Required. A certifier or surveyor has to approve the building work.

Source

NT Planning Scheme 2020 cl 1.8(1)(a); Building Act 1993 (NT) s 4 and s 55 · read 2026-09-15

Read the clauseMore about Internal alterations
DeckNo approvalStay inside the numbers below and nobody has to approve this.

Stay inside these

  • Floor area no more than 25 m²
  • Floor no more than 0.4 m above the ground(measured from the ground as it is now, not from a level you build up to)
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

Not required for work that stays inside the limits above.

Source

NT Building Note 114 type 4 · read 2026-09-15

Read the clauseMore about Deck
Pergola or patioNo approvalStay inside the numbers below and nobody has to approve this.

Stay inside these

  • Floor area no more than 30 m²
  • A solid roof makes it a verandah or a patio rather than a pergola, and the exemption stops applying.
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

Not required for work that stays inside the limits above.

Source

Building Regulations 1993 (NT) reg 3(1)(d) · read 2026-09-15

Read the clauseMore about Pergola or patio
CarportNo approvalStay inside the numbers below and nobody has to approve this.

Stay inside these

  • At least 4.5 m behind the building line
  • A building permit is still required even though no planning approval is.
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

It depends what you touch. Small and non structural, no. Anything beyond that, yes.

Source

Building Regulations 1993 (NT) reg 33(1); NT Building Note 114 types 1 to 3 · read 2026-09-15

Read the clauseMore about Carport
FenceNo approvalStay inside the numbers below and nobody has to approve this.

Stay inside these

  • Side and rear fence no higher than 1.8 m
  • Wall height no more than 1 m(A masonry or concrete fence has its own, lower limit.)
  • The rule sets the height by material, not by which boundary the fence is on. The street frontage is controlled by the overlay and the corner rule instead.
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

Not required for work that stays inside the limits above.

Source

Building Regulations 1993 (NT) reg 3(1)(c); NT Building Note 114 type 6 · read 2026-09-15

Read the clauseMore about Fence
Garden shedNo approvalStay inside the numbers below and nobody has to approve this.

Stay inside these

  • Floor area no more than 15 m²
  • Height no more than 2.5 m(measured from the ground as it is now, not from a level you build up to)
  • It has to stay non habitable. A bed, a shower or a kitchenette turns it into a second dwelling.
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

It depends what you touch. Small and non structural, no. Anything beyond that, yes.

Source

NT Building Note 114 types 1 and 2 · read 2026-09-15

Read the clauseMore about Garden shed
Garage conversionBuilding approval onlyNo planning approval, but the building work itself still has to be approved.

Stay inside these

This one has no measurements. It is a test of what you touch, not of how big it is.

  • Turning a garage into a room changes the class of the building, and that is what takes it out of every simple pathway.
  • A building permit is still required even though no planning approval is.
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

Required. A certifier or surveyor has to approve the building work.

Source

Building Act 1993 (NT) s 55; no exemption in Building Regulations 1993 reg 3 or Building Note 114 · read 2026-09-15

Read the clauseMore about Garage conversion
Second storeyBuilding approval onlyOn the My Block pageNo planning approval, but the building work itself still has to be approved.

Stay inside these

This one has no measurements. It is a test of what you touch, not of how big it is.

  • This one belongs to the land report, not to this page.
  • A building permit is still required even though no planning approval is.
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

Required. A certifier or surveyor has to approve the building work.

Source

NT Planning Scheme 2020 cl 1.8(1)(a); Building Act 1993 (NT) s 55 · read 2026-09-15

Read the clauseMore about Second storey
Swimming poolNo approvalStay inside the numbers below and nobody has to approve this.

Stay inside these

  • Water no deeper than 0.3 m(Anything that can hold water deeper than 300 mm is caught, a portable one included.)
  • The child resistant barrier is its own law with its own penalties, and it applies whether or not the pool itself needed approval.
  • These are the Territory rules as published. There is no cadastral or planning layer this site can query for a Territory address, so this row has not been checked against your own lot.

Overlays on this lot

No address, so no overlay was read. This row is the clean lot position.

Building approval

Not required for work that stays inside the limits above.

Source

NT Building Note 114 type 8; Swimming Pool Safety Act 2004 (NT) s 6 and s 8 · read 2026-09-15

Read the clauseMore about Swimming pool

Every threshold is read from the instrument named on its row, on the date shown. Council controls sit on top of all of them and are not in this table.

What other people paid for the same job

Published projects with the price attached and a badge saying where the number came from. Nothing here is estimated by us.

Published projects in Kitchen and bathroom · Whole home renovation · Alterations and additions, most recent first.

  • Collingwood Kitchen and Bathroom Renovation
    Kitchen and bathroomCollingwood VIC

    Collingwood Kitchen and Bathroom Renovation

    Budget on the builder's website: A$65,000

    5 weeks

  • Richmond Modern Bathroom Renovation
    Kitchen and bathroomRichmond VIC

    Richmond Modern Bathroom Renovation

    Budget on the builder's website: A$30,000

    3 weeks

  • Prahran Main Bathroom Renovation
    Kitchen and bathroomPrahran VIC

    Prahran Main Bathroom Renovation

    Budget on the builder's website: A$25,000

    3 weeks

  • Prahran Bathroom Renovation
    Kitchen and bathroomPrahran VIC

    Prahran Bathroom Renovation

    Budget on the builder's website: A$25,000

    3 weeks

  • Elsternwick Bathroom Renovation
    Kitchen and bathroomElsternwick VIC

    Elsternwick Bathroom Renovation

    Budget on the builder's website: A$35,000

    3 weeks

  • Armadale Bathroom and Ensuite Renovation
    Kitchen and bathroomArmadale VIC

    Armadale Bathroom and Ensuite Renovation

    Budget on the builder's website: A$70,000

    5 weeks

  • Brunswick Kitchen Bathroom Laundry Renovation
    Kitchen and bathroomBrunswick VIC

    Brunswick Kitchen Bathroom Laundry Renovation

    Budget on the builder's website: A$80,000

    4 weeks

  • Balwyn Bathroom Renovation Project
    Kitchen and bathroomBalwyn VIC

    Balwyn Bathroom Renovation Project

    Budget on the builder's website: A$30,000

    3 weeks

  • Kew Bathroom Renovation, Custom Vanity
    Kitchen and bathroomKew VIC

    Kew Bathroom Renovation, Custom Vanity

    Budget on the builder's website: A$30,000

    3 weeks

Who did these jobsThe builders and trades credited on the projects above.

Three things to settle before the first tradesman arrives

None of them is on the quote, and all three can stop the job after it has started.

Heritage and conservation areas

A heritage item or a conservation area removes most of the easy answers on this page. Check your own address to find out which one you are on.

Read off the state planning layer. It does not say which kind of listing it is, and the kinds do not have the same effect.

Asbestos

If your house was built before 1990, fibro sheeting, eaves, wet area linings and vinyl backing may contain asbestos. Every state requires a licensed removalist above a small quantity, and the rules bind the homeowner as well as the builder.

We do not know the year your house was built and we do not guess it. Nothing in the land data says so.

Strata and the owners corporation

If you own a unit, a villa or a townhouse, the owners corporation is a second approval sitting on top of everything on this page.

Read off the lot identifier in the cadastre.

Extending, or adding a storey

A renovation that makes the house bigger is a different question with a different answer, and it has its own door. The land report works out whether the state fast track is open for an extension on your block, how long this council takes and what the neighbours declared.

Open the land report

SeeBuilds

See what was built, what it cost, then find who built it

About →
Homeowners+
Projects →Find people →My place →Build guides →
Professionals+
I am a professional →Send a few photos →Publish a project →Directory →
Data+
Data and licences →Suburb index →Council costs →Building cost by city and region →

Language

English简体中文繁體中文Tiếng Việtالعربية한국어

Legal

Privacy Policy →Terms of Service →Unsubscribe from email →

Data is used under its publishers' open licences; see Data and licences.

© 2026 SeeBuilds