Renovation approvals
Kitchen, bathroom, deck, pergola, carport, fence, shed, garage conversion, pool. Enter your address and see which of them needs nothing, which needs a certificate and which needs the council, at this address rather than in general.
No signup. The address is used to read the heritage, flood and zoning layers over your lot.
The TAS position on an ordinary residential lot. Enter an address to apply the overlays on your own.
Stay inside these
This one has no measurements. It is a test of what you touch, not of how big it is.
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
Not required for work that stays inside the limits above.
Source
Tasmanian Planning Scheme SPP cl 4.3.2; Directors Determination cl 2.0.2 · read 2026-09-15
Read the clauseMore about KitchenStay inside these
This one has no measurements. It is a test of what you touch, not of how big it is.
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
It depends what you touch. Small and non structural, no. Anything beyond that, yes.
Source
Tasmanian Planning Scheme SPP cl 4.3.2; Directors Determination cl 2.0.2 and cl 3.0.1 · read 2026-09-15
Read the clauseMore about BathroomStay inside these
This one has no measurements. It is a test of what you touch, not of how big it is.
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
Not required for work that stays inside the limits above.
Source
Tasmanian Planning Scheme SPP cl 4.3.2; Directors Determination cl 2.1.1 · read 2026-09-15
Read the clauseMore about Internal alterationsStay inside these
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
Not required for work that stays inside the limits above.
Source
Tasmanian Planning Scheme SPP cl 4.3.6; Directors Determination cl 1.3.5 and cl 1.6.1 · read 2026-09-15
Read the clauseMore about DeckStay inside these
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
Not required for work that stays inside the limits above.
Source
Tasmanian Planning Scheme SPP cl 4.3.11; Directors Determination cl 1.3.9 · read 2026-09-15
Read the clauseMore about Pergola or patioStay inside these
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
Not required for work that stays inside the limits above.
Source
Tasmanian Planning Scheme SPP cl 6.6.1 and GRZ cl 8.4; Directors Determination cl 1.3.1 and cl 2.3.1 · read 2026-09-15
Read the clauseMore about CarportStay inside these
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
Not required for work that stays inside the limits above.
Source
Tasmanian Planning Scheme SPP cl 4.6.3 and cl 4.6.4; Directors Determination cl 1.3.6 to 1.3.8 · read 2026-09-15
Read the clauseMore about FenceStay inside these
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
Not required for work that stays inside the limits above.
Source
Tasmanian Planning Scheme SPP cl 4.3.7; Directors Determination cl 1.3.1 · read 2026-09-15
Read the clauseMore about Garden shedStay inside these
This one has no measurements. It is a test of what you touch, not of how big it is.
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
It depends what you touch. Small and non structural, no. Anything beyond that, yes.
Source
Tasmanian Planning Scheme SPP cl 4.3.2; Directors Determination cl 3.0.1 · read 2026-09-15
Read the clauseMore about Garage conversionStay inside these
This one has no measurements. It is a test of what you touch, not of how big it is.
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
Required. A certifier or surveyor has to approve the building work.
Source
Tasmanian Planning Scheme SPP cl 6.6.1 and GRZ cl 8.4; Directors Determination cl 3.0.1 · read 2026-09-15
Read the clauseMore about Second storeyStay inside these
Overlays on this lot
No address, so no overlay was read. This row is the clean lot position.
Building approval
Required. A certifier or surveyor has to approve the building work.
Source
Tasmanian Planning Scheme SPP cl 6.6.1; Directors Determination cl 3.1.8 and cl 1.3.11 · read 2026-09-15
Read the clauseMore about Swimming poolEvery threshold is read from the instrument named on its row, on the date shown. Council controls sit on top of all of them and are not in this table.
Published projects with the price attached and a badge saying where the number came from. Nothing here is estimated by us.
Published projects in Kitchen and bathroom · Whole home renovation · Alterations and additions, most recent first.

岩石区遗产住宅浴室翻新
4 weeks

亨特山浴室翻新项目
4 weeks

Little Bay浴室翻新项目
4 weeks

Gladesville 浴室翻新
3 weeks

巴尔曼浴室翻新项目
3 weeks

兰德威克浴室翻新项目

Hornsby卫生间黑白风格翻新

霍恩斯比黑白风浴室翻新

Castle Hill 浴室翻新项目
None of them is on the quote, and all three can stop the job after it has started.
A heritage item or a conservation area removes most of the easy answers on this page. Check your own address to find out which one you are on.
Read off the state planning layer. It does not say which kind of listing it is, and the kinds do not have the same effect.
If your house was built before 1990, fibro sheeting, eaves, wet area linings and vinyl backing may contain asbestos. Every state requires a licensed removalist above a small quantity, and the rules bind the homeowner as well as the builder.
We do not know the year your house was built and we do not guess it. Nothing in the land data says so.
If you own a unit, a villa or a townhouse, the owners corporation is a second approval sitting on top of everything on this page.
Read off the lot identifier in the cadastre.
A renovation that makes the house bigger is a different question with a different answer, and it has its own door. The land report works out whether the state fast track is open for an extension on your block, how long this council takes and what the neighbours declared.
Open the land report